top of page

Portfolio

Collaboration

KEY WEST
Anderlecht, Brussels

Improved planning efficiency through the implementation of coordinated collaboration between MEP, Architecture and Structure. Time savings and improved material cost estimation.

KEY WEST

Client: BPI Real Estate

Location: Anderlecht, Brussels (Belgium)

Year of construction: 2018 (In progress / Planing design completed)

Area: 65.000 m2

Type: Mixt use: Residential + Offices + Commercial

Architecture: Henning Larsen Architects + A2RC Architects

Structural Engineering: SGI Groupe

MEP Engineering: CES Contracting Engineering

52.600 m2 homes surface; +5.000 m2 office space; 2.500 m2 commercial area

Mixed construction between private residential, office complex and commercial use in the heart of Brussels. The development includes 6 buildings, sharing a parking lot under their footprint.

 

The provision of large green spaces and even the feasibility study of increasing sustainability through the use of Geothermal Heat Pumps value this construction as an attraction for a more efficient city.

KeyWest1.jpg
Key west, picture 1.png
bottom of page